Ning ICP prepared 18000321-1

Scene style

The synthesis workshop organized and carried out emergency drills

On October 21, the quality testing center organized employees to carry out an emergency rescue drill for liquid ammonia leakage。In this exercise, the leakage of a small amount of liquid ammonia for analysis is assumed as the background, and water is used to replace liquid ammonia。During the exercise, according to the exercise plan, the emergency teams were quickly in place, each performed their duties, and conducted drills and disposal in accordance with the plan。After the exercise, Deputy Director Pan Rong made on-site comments, pointed out the shortcomings and put forward suggestions for improvement。Through this drill, the staff's first aid is tested... [全文]

2021-10-31

Urea plant to strengthen winter equipment operation management

Combined with winter equipment operation management, the urea workshop carried out the activity of "checking hidden dangers and plugging loopholes"。Workshop staff check the hidden problems in equipment management, from the equipment optimization, production operation, safety and environmental protection, equipment inspection and charter sanitation, etc., to develop a number of safeguard measures to effectively ensure the smooth operation of equipment。The workshop has also developed and improved the "Winter cold and freezing plan", organized employees to learn the content of the plan, strengthened the safety education of employees on the job, and guided employees to carefully operate and exercise strictly... [全文]

2021-10-24

The synthesis workshop should do a good job of cold and frost prevention

Recently, the temperature continues to decrease, in order to ensure the safety of equipment, smooth winter。Synthetic workshop to increase inspection, improve the winter anti-freeze program, do a good job of anti-freeze hidden dangers, combined with the actual situation, do a good job of winter anti-freeze work。Workshop leaders organize the investigation of anti-freeze hidden dangers, check equipment, pipelines, valves and other key parts, formulate corresponding control measures, sort out the cold and anti-freeze equipment and facilities account, clarify responsibilities step by step, and implement anti-freeze protection measures。Team members plus... [全文]

2021-10-24

A glimpse of the staff

The maintenance personnel changed the feed water blind plate of the scrubber boiler of gasification C furnace。(Li Yanxiang) The maintenance personnel disassembled the inlet valve of the feed pump [] in the clarifier tank between gasification。(Yang Jiaxin) Maintenance personnel to the synthesis workshop 03P0701A pump filter to disassemble。(Li Zongna) The maintenance personnel adjusted the position of P701A pump impeller in the synthesis workshop。(Hu Jicai) [Full text]

2021-08-10

A glimpse of the staff

[全文]

2021-07-22

A glimpse of the staff

[全文]

2021-06-18

A glimpse of the staff

[全文]

2021-06-16

A glimpse of the staff

[全文]

2021-05-20

A glimpse of the staff

[全文]

2021-04-02

A glimpse of the staff

[全文]

2021-03-19

About us Corporate culture News consultation Party and mass building Product display Talent recruitment

Contact: General Management Office

Contact number: 0951-5923189

Resume email: nxhnhx@126.com

Add: Ningxia Hui Autonomous Region Yinchuan City Ningdong Energy chemical Base coal chemical industry Park 【手机买球网站】

Copyright©2021 All Rights Reserved. Copyright©2021 all rights reserved. Ning ICP prepared 18000321-1   Visits: 4,653,665 times

Ning Wan Anbei 64018102000194