Ning ICP prepared 18000321-1

Scene style

A glimpse of the staff

[全文]

2021-02-25

A glimpse of the staff

[全文]

2021-01-10

A glimpse of the staff

[全文]

2020-12-04

A glimpse of the staff

The maintenance personnel changed the feed water blind plate of the scrubber boiler of gasification C furnace。(Li Yanxiang) The maintenance personnel disassembled the inlet valve of the feed pump [] in the clarifier tank between gasification。(Yang Jiaxin) Maintenance personnel to the synthesis workshop 03P0701A pump filter to disassemble。(Li Zongna) The maintenance personnel adjusted the position of P701A pump impeller in the synthesis workshop。(Hu Jicai) [全文]

2020-12-02

About us Corporate culture News consultation Party and mass building Product display Talent recruitment

Contact: General Management Office

Contact number: 0951-5923189

Resume email: nxhnhx@126.com

Add: Ningxia Hui Autonomous Region Yinchuan City Ningdong Energy chemical Base coal chemical industry Park 【手机买球网站】

Copyright©2021 All Rights Reserved. Copyright©2021 all rights reserved. Ning ICP prepared 18000321-1   Visits: 4,633,676

Ning Wan Anbei 64018102000194