Ning ICP prepared 18000321-1

Excellent employee

September 2019 "One star per month" style show

Read: 1795 Time: 2019-09-25 19:04

  Gasification workshop site Tian Biao

  Brief introduction of deeds

  Comrade Tian Biao entered the gasification workshop of Heming Company in April 2013, based on his own post work, diligent, practical and serious, active and motivated;Not afraid of hardship, not afraid of fatigue, every time the device maintenance, you can see his busy figure in the maintenance site。The comrade's practical work style, serious study of business, humble attitude has been widely recognized by colleagues。

  At 8:40 on September 11, 2019, Tian Biao was inspecting the first floor of gasification as usual when he suddenly heard an abnormal sound, immediately tracked down the source of the sound, and found that the chain of the C set of slag extraction machine fell off, causing abnormal noise in operation。Immediately report to the shift leader, and contact the main control personnel gasification C furnace do not discharge slag, the scene emergency stop C set of slag extraction machine。Shift leader Shi Junshan immediately reported the situation to the workshop leaders, and rushed to the scene with the workshop professional manager Zhai Duorui, and confirmed that the guide wheel chain in the slag dredging machine fell off after inspection。Immediately report to the dispatching room, and contact the relevant units to repair the C set of slag extraction machine, after everyone's joint efforts, 12:20, C set of slag extraction machine resumed operation。If it is not for Tian Biao timely detection of hidden dangers, the chain of the slag extraction machine will be pulled off, greatly increasing the workload and difficulty of emergency repair。His careful inspection bought time for the repair work。

  As a front-line employee, Tian Biao found a lot of hidden dangers in the work。8月17日,In the process of increasing pressure after feeding in gasification C furnace,His inspection found that the PDT-2041C root valve on the eighth floor of gasification was leaking;September 15th,His inspection found that the large flange of the burner of gasification C furnace was leaking;September 23rd,His inspection found that the large flange of the burner of gasification B furnace was leaking,All were reported and dealt with in time,Safety accidents and production accidents are avoided。

  Comments:

  With his meticulous and rigorous work style and professional safety quality, Comrade Tian Biao found the equipment abnormalities in time, which provided a strong support for the follow-up safe and effective treatment of production hazards and ensured the stable and excellent operation of the production equipment。



About us Corporate culture News consultation Party and mass building Product display Talent recruitment

Contact: General Management Office

Contact number: 0951-5923189

Resume email: nxhnhx@126.com

Add: Ningxia Hui Autonomous Region Yinchuan City Ningdong Energy chemical Base coal chemical industry Park 【手机买球网站】

Copyright©2021 All Rights Reserved. Copyright©2021 all rights reserved. Ning ICP prepared 18000321-1   Visits: 4,577,699

Ning Wan Anbei 64018102000194